Current site: Peikko South Africa. Do you want to change country or language?

Logistics Center Messerli Shop AG, null, Switzerland

  • Building Type:
  • Industrial Buildings
Fullscreen map Close

Many product solutions for modern slim-floor logistic building

Peikko supplied some of its product solutions for the two-story modern logistics center in Wil (ZH) for Messerli Shop AG. The lowest floor, for example, was realized with the DELTABEAM® Frame system solution, consisting of composite beams and composite steel columns. The floor area measures 70 x 100 meters.

Thanks to BIM planning and the use of prefabricated elements, a fast construction time was achieved.

Staging was required for the delivery. This meant that precise delivery lists had to be drawn up, which also considered the special static systems.

Peikko also supplied anchor bolts and the TERAJOINT® free movement joint system. This provides durable edge protection for heavy-duty floors.

Read more down-arrow.png

Project facts

Project size:
12600 m2
Floors:
2
Developer:
METHABAU
Construction Company:
METHABAU
Structural Designer:
Furrer AG
Architect:
METHABAU
Precaster:
BFU GmbH
Delivery year:
2021
Completion year:
2022

Contact us

Sascha Schaaf

Sascha Schaaf

Project Development Manager

Tel. +49 6436 916464
Mob. +49 175 271 2173
[email protected]